I suggest you ...

Abort grid node processing in NCrunch Console if no more tests are to be executed

From forum: https://forum.ncrunch.net/yaf_postst2641_Why-is-not-NCrunch-aborting-build-analysis-on-pending-grid-nodes-when-no-work-remains.aspx

If I have 1 slow grid node connected to NCrunch Console, and NCrunch engine has completed all tests for the engine mode, I want the slow grid node to abort its build/analyze processing since there are no more tests to execute anyhow.

Background: My NCrunchConsole runs on a fast server, one grid node might be very slow. So even though the console tool is completed building/analyzing/running tests within 3 minutes, it sits and wait for the slow grid node to complete building for another e.g. 15 minutes (see forum post for a timeline example).

1 vote
Sign in
Check!
(thinking…)
Reset
or sign in with
  • facebook
  • google
    Password icon
    Signed in as (Sign out)

    We’ll send you updates on this idea

    GreenMoose shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

    0 comments

    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      Submitting...

      Feedback and Knowledge Base